[1]
Ahmad Aditya and Yetty Dwi Lestari, “Bridging Strategic Analysis and Maintenance Execution: A Proposed SWOT-AHP Integrated Framework for Accelerating Periodic Overhaul Duration at Coal-Fired Power Plants in the Jamali Grid Region”, jmcbus, vol. 4, no. 2, pp. 295–308, Apr. 2026.