AHMAD ADITYA; YETTY DWI LESTARI. Bridging Strategic Analysis and Maintenance Execution: A Proposed SWOT-AHP Integrated Framework for Accelerating Periodic Overhaul Duration at Coal-Fired Power Plants in the Jamali Grid Region. Journal of Management and Creative Business, [S. l.], v. 4, n. 2, p. 295–308, 2026. DOI: 10.30640/jmcbus.v4i2.6569. Disponível em: https://jurnaluniv45sby.ac.id/index.php/jmcbus/article/view/6569. Acesso em: 8 aug. 2026.