(1)
Ahmad Aditya; Yetty Dwi Lestari. Bridging Strategic Analysis and Maintenance Execution: A Proposed SWOT-AHP Integrated Framework for Accelerating Periodic Overhaul Duration at Coal-Fired Power Plants in the Jamali Grid Region. jmcbus 2026, 4, 295-308.