[1]
Ahmad Aditya and Yetty Dwi Lestari 2026. Bridging Strategic Analysis and Maintenance Execution: A Proposed SWOT-AHP Integrated Framework for Accelerating Periodic Overhaul Duration at Coal-Fired Power Plants in the Jamali Grid Region. Journal of Management and Creative Business. 4, 2 (Apr. 2026), 295–308. DOI:https://doi.org/10.30640/jmcbus.v4i2.6569.